Our Work

Explore commercial projects completed with quality craftsmanship, collaboration, and attention to detail.

Commercial Construction Projects

  • Columbia Boulevard Wastewater Treatment Plan-STEP Program

    Construction-phase engineering coordination and project controls support for the City of Portland Bureau of Environmental Services (BES) STEP Program at the Columbia Boulevard Wastewater Treatment Plant. The project required management of large-volume RFIs, submittals, engineering documentation, and coordination across multiple active treatment facilities and technical disciplines within an operating wastewater plant environment. Concrete Rose Construction supported daily coordination between contractors, Engineers of Record (EORs), Jacobs, and BES staff through structured document control, construction tracking, issue management, and construction-phase administrative support. Through disciplined coordination, organized reporting systems, and responsive communication management, the team helped maintain continuity and accountability across active infrastructure improvements within one of the region’s largest wastewater treatment facilities.

    Project Highlights:

    • Construction-Phase Engineering Coordination

    • RFI & Submittal Management

    • Project Controls & Document Management

    • cViz & SharePoint Coordination

    • Multi-Discipline EOR Coordination

    • Active Wastewater Treatment Facility

    • Public Infrastructure Support

  • BES CBWTP Reuse System Replacement

    Construction-phase design support and project coordination services for the Bureau of Environmental Services (BES) CBWTP Reuse System Replacement project at the Columbia Boulevard Wastewater Treatment Plant. The project required coordination between engineering teams, field personnel, contractors, and facility operations within an active wastewater treatment environment undergoing system improvements and infrastructure upgrades. Concrete Rose Construction supported project kickoff coordination, RFI and submittal management, confined-space access coordination, document control, field reporting, and ongoing construction-phase communication throughout active facility work. Through organized project tracking, responsive coordination, and disciplined documentation management, the project maintained continuity between design, field operations, and construction administration while supporting safe and efficient execution within a critical public utility facility.

    Project Highlights:

    • Construction-Phase Design Support

    • Project Coordination & Administration

    • RFI & Submittal Management

    • Confined Space Coordination

    • Document Control & Version Management

    • Field Coordination & Reporting

    • Active Wastewater Treatment Facility

    • Public Infrastructure Improvements

  • Constructing Hope Pre-Apprenticeship Program | Addition and Tenant Improvement

    Constructing Hope Pre-Apprenticeship Program Addition & Tenant Improvement Expansion and renovation of an active workforce training facility designed to increase training capacity and improve operational flow. The project included a 5,500 SF interior renovation and a 1,500 SF addition completed within an occupied environment. Concrete Rose Construction managed structural modifications, upgraded building systems, and reconfigured interior spaces to support classrooms, administrative operations, and hands-on training environments. Working within an active facility required careful coordination, phased execution, and disciplined schedule management to minimize disruption while maintaining daily operations. The result was a fully integrated and modernized training facility designed to support long-term program growth and community impact.

    Project Highlights:

    • 5,500 SF Interior Renovation

    • 1,500 SF Building Addition

    • Occupied Facility Construction

    • Structural & Building System Upgrades

    • Classroom & Training Space Improvements

  • St. Joseph Grand Lodge of Oregon Historic Façade Reconstruction

    Historic façade reconstruction of a 6,000 SF commercial building originally constructed in 1908. The project required exterior envelope replacement, hazardous material abatement, and structural repair within an active urban corridor. Concrete Rose Construction coordinated asbestos abatement, structural repairs, full window replacement, weather barrier installation, and new exterior finishes while protecting the integrity of the existing structure. Through disciplined sequencing, safety-focused coordination, and controlled execution, the project delivered a stabilized and code-compliant exterior designed for long-term durability and continued use.

    Project Highlights:

    • Historic Building Restoration

    • Exterior Envelope Replacement

    • Structural Repairs

    • Asbestos Abatement

    • Occupied Urban Site

  • Portland Community College – Carolyn Moore Writers House Institutional Renovation

    Renovation of a 2,882 SF residential-scale facility designed to support faculty, visiting authors, and program-driven educational use for Portland Community College. The project included accessibility upgrades, plumbing replacement, restroom reconfiguration, deck reconstruction, and installation of a new accessible kitchen while preserving key architectural elements of the existing structure. Concrete Rose Construction worked closely with the PCC design team to coordinate existing conditions, system upgrades, and finish preservation while aligning scope, budget, and long-term functionality.

    Project Highlights:

    • Accessibility Upgrades

    • Interior & Exterior Renovation

    • Plumbing System Replacement

    • Deck Reconstruction

    • Institutional Facility Improvements

  • Ladybug Childcare Center Renovation

    Licensed Childcare Facility Renovation Renovation of an active childcare facility completed within a highly regulated environment where safety, accessibility, and uninterrupted daily operations were essential. Concrete Rose Construction delivered the project through phased construction and careful coordination, maintaining clear separation between work zones and occupied spaces while ensuring compliance with life-safety and licensing requirements. The result was a fully upgraded childcare environment completed with minimal disruption to staff, families, and ongoing operations.

    Project Highlights:

    • Active Occupied Facility

    • Phased Construction

    • Accessibility Compliance

    • Life-Safety Coordination

    • Childcare Facility Upgrades

  • Portland Community College – VRF System Replacement

    Mechanical System Upgrade Complex VRF system replacement completed within an active campus environment where timing, coordination, and operational continuity were critical to project success. The project involved removal and replacement of mechanical systems across occupied facilities, requiring detailed shutdown planning, sequencing, and integration with existing building infrastructure. Concrete Rose Construction supported preconstruction planning, procurement coordination, and construction oversight to ensure a controlled and schedule-driven installation process with minimal disruption to campus operations.

    Project Highlights:

    • VRF System Replacement

    • Active Campus Environment

    • Mechanical Infrastructure Upgrade

    • Phased Installation Coordination

    • Occupied Facility Construction

Let’s build something great together.

Partner with a team committed to community, diversity, and high-quality construction. Contact us today to discuss how we can support your goals.